ALEXANDRIA AREA HIGH SCHOOL MAJOR RENOVATIONs
solution
ARCHITECTURAL WOODWORK, Athletic, FLOORING, LABORATORY, LOCKERS & STORAGE, SEATING & fURNITURE, TECHNICAL EDUCATION
Market
K-12 Education, SCIENCE & TECHNOLOGY
location
ALEXANDRIA, Minnesota
PARTNERS
SINK COMBS ARCHITECTS
ABOUT THE PROJECT
The concept of the major renovations in Alexandria Area High School was to create an environmentally friendly school that would be relevant many years in the future. Many opinions were surveyed to figure out how the school would look, and therefore teach. H2I Group has many of our education solutions involved in this project to align with a forward-thinking way of teaching.
Alexandria was interested in a technology education lab that would bring all the four core parts of STEM (Science, Technology, Engineering, and Math) into the learning space. These solutions included Stratasys 3D printers, MakerBot 3D printers, 3D scanners, CNC machines, a Universal Laser Systems’ Engraver, Greene Manufacturing furniture, robotics & automations systems, a Roland vinyl printer & cutter, and a 3D wax printer.
Along with our STEM solutions, we also implemented lockers, learning stairs, wood flooring, basketball backstops, gym control systems, divider curtains, wall pads, tip n’ roll bleachers, lab furniture, sinks, and fume hoods.
PRODUCTS & SERVICES
- Basketball Backstops
- Gym Control System
- Divider Curtains
- Wall Pads
- Tip N' Roll Bleachers
- Stratasys 3D Printers
- MakerBot 3D Printers
- 3D Scanners
- CNC Machines
- Universal Laser System's Laser Engraver
- Greene Manufacturing Furniture
- Lab Furniture
- Sinks
- Fume Hoods
- Robotics
- Roland Vinyl Sign Cutter
- 3D Wax Printer
- Printers & Cutters
RELATED PROJECTS
GET STARTED
LET’S TALK ABOUT YOUR
NEXT PROJECT
CONTACT US
FIND MORE ON THE BLOG
April 16, 2025
The Importance of the Right Benchtop Fume Hood
Learn how to choose the right benchtop fume hood for your lab. Discover key factors—like chemical types, ventilation systems, and space requirements—that impact safety, efficiency, and compliance.
Read MoreMarch 31, 2025
Keep Your Gym Floor Looking and Performing Its Best: Schedule a Summer Screen and Recoat
Keep your gym floor in top condition with a summer screen and recoat! This essential maintenance extends the life of your hardwood sports flooring, enhances safety, and prevents costly repairs. Schedule your recoat during summer break for minimal disruption and optimal results. Contact H2I Group today to ensure your gym floor is game-ready for the school year!
Read More