CARLSBAD HIGH SCHOOL SCIENCE BUILDING
solution
Laboratory
Market
k-12 Education
location
Carlsbad, California
PARTNERS
Lionakis, Erickson-Hall
ABOUT THE PROJECT
H2I Group worked with architect Lionakis, general contractor Erickson-Hall, and CiF to bring new science facilities to Carlsbad High School. We provided Wood Casework and Fume Hoods to increase the safety and functionality in Carlsbad’s science labs.
The new space has been designed to meet SEFA-8W standards, aligning its performance characteristics with the same quality utilized by the laboratory and university markets. We used CiF Educator Series Casework in this project to achieve this goal. This project is an example of how we work with schools to provide functional spaces that improve learning environments for students.
PRODUCTS & SERVICES
- CiF Wood Casework
- Fume Hoods
RELATED PROJECTS
Prelude Therapeutics
Wilmington, Delaware
Enveda Biosciences
Boulder, CO
Maricopa Institute of Technology STEM Building
Phoenix, AZ
Industrial Refinery Laboratory
Garyville, LA
GET STARTED
LET’S TALK ABOUT YOUR
NEXT PROJECT
CONTACT US
FIND MORE ON THE BLOG
November 6, 2024
Racing Against Time: USC Engineering Students Maximize Speed and Efficiency with 3D Printing
As part of the University of Southern California's Formula SAE race teams annual international collegiate competition, their task is to design, build, and field a race car within a short time window and with limited resources. For these student teams, additive manufacturing (AM) technology is a tool they lean on heavily to give their cars the best chance at the winner’s circle and maximize their time to make that happen.
Read MoreOctober 14, 2024
A Comprehensive Guide to Gym Floor Installation and Care
When designing a gym, flooring is one of the most critical components that can make a big difference in the finished project. A well-installed gym floor not only enhances the aesthetics of the space but also ensures safety, durability, and optimal performance.
Read More