ST. CLOUD TECH HIGH SCHOOL
GYM & lABS
ABOUT THE PROJECT
St. Cloud Tech High School was rebuilt with the goal of creating collaborative learning spaces that would assist students in preparing for the workforce. This major project brought in many local firms, including H2I Group, to work together to achieve this goal in a timely manner. Cooperative Purchasing Contracts were also utilized in this project.
H2I Group implemented various athletic, laboratory, lockers & storage, and flooring solutions in St. Cloud Tech High School. More specifically, our team was responsible for lab furniture, lab equipment, fume hoods, wood gymnasium flooring, basketball equipment, volleyball equipment, wall pads, and corridor & athletic lockers.
Willie Jett, the Superintendent at St. Cloud Area School District has said, “Tech High School has become a hub of community activity and a great source of pride. It provides an opportunity for the community to come together and see visibly how this school supports students and prepares them for careers and their future.” H2I Group wants to create exceptional solutions for exceptional spaces, and as Jett said, “There is an undeniable WOW factor as you walk through the doors.” This major project required a lot of collaboration between many groups but ended up being an overall success.
PRODUCTS & SERVICES
- Lab Furniture
- Lab Equipment
- Fume Hoods
- Flooring
- Basketball Equipment
- Volleyball Equipment
- Wall Pads
- Corridor Lockers
- Athletic Lockers
RELATED PROJECTS
Red Rock Central Public School
Lamberton, Minnesota
White Bear Lake High School Auditorium
White Bear Lake, MN
Prelude Therapeutics
Wilmington, Delaware
Academy Of Holy Angels
Richfield, MN
GET STARTED
LET’S TALK ABOUT YOUR
NEXT PROJECT
CONTACT US
FIND MORE ON THE BLOG
November 6, 2024
Racing Against Time: USC Engineering Students Maximize Speed and Efficiency with 3D Printing
As part of the University of Southern California's Formula SAE race teams annual international collegiate competition, their task is to design, build, and field a race car within a short time window and with limited resources. For these student teams, additive manufacturing (AM) technology is a tool they lean on heavily to give their cars the best chance at the winner’s circle and maximize their time to make that happen.
Read MoreOctober 14, 2024
A Comprehensive Guide to Gym Floor Installation and Care
When designing a gym, flooring is one of the most critical components that can make a big difference in the finished project. A well-installed gym floor not only enhances the aesthetics of the space but also ensures safety, durability, and optimal performance.
Read More