RED ROCK CENTRALPUBLIC SCHOOL
solution
Athletic, FLOORING, LOCKERS & STORAGE, SEATING & fURNITURE
Market
K-12 Education
location
Lamberton, Minnesota
PARTNERS
Kraus Anderson, MLA architects
ABOUT THE PROJECT
The Red Rock Central Public School in Lamberton, MN, is a new PreK-12 facility built from the ground up, with construction starting in May 2023 and finishing in October 2024. H2I Group provided key solutions, including corridor lockers, locker room lockers, and athletic gear lockers from DeBourgh, List KD, and RFS/Spec, installed by L&L Contracting. The 409-seat auditorium features Irwin Marquee seating with Sherpa/Shire fabric, installed by Three-Sixty. H2I Group also supplied learning stairs, wood gym flooring for the main and auxiliary gyms and stage flooring. Completed on time and within budget, this project reflects another successful H2I Group collaboration.
PRODUCTS & SERVICES
- Learning Stairs
- Wood Gym Flooring
- Stage Flooring
- Corridor Lockers
- Locker Room Lockers
- Athletic Open Gear Lockers
- Auditorium Seating
RELATED PROJECTS
White Bear Lake High School Auditorium
White Bear Lake, MN
Academy Of Holy Angels
Richfield, MN
Coon Rapids High School Fieldhouse Flooring
Coon Rapids, MN
Schafer Richardson
Minneapolis, Minnesota
GET STARTED
LET’S TALK ABOUT YOUR
NEXT PROJECT
CONTACT US
FIND MORE ON THE BLOG
November 6, 2024
Racing Against Time: USC Engineering Students Maximize Speed and Efficiency with 3D Printing
As part of the University of Southern California's Formula SAE race teams annual international collegiate competition, their task is to design, build, and field a race car within a short time window and with limited resources. For these student teams, additive manufacturing (AM) technology is a tool they lean on heavily to give their cars the best chance at the winner’s circle and maximize their time to make that happen.
Read MoreOctober 14, 2024
A Comprehensive Guide to Gym Floor Installation and Care
When designing a gym, flooring is one of the most critical components that can make a big difference in the finished project. A well-installed gym floor not only enhances the aesthetics of the space but also ensures safety, durability, and optimal performance.
Read More