University High School California Street Campus
solution
Athletic, Laboratory
Market
K-12 Education
location
San Francisco, California
PARTNERS
Leddy Maytum Stacy ARCHITECTS, Truebeck Construction
ABOUT THE PROJECT
University High School’s California Street campus is the school’s first ground-up project in more than 40 years. The project is a 48,000-square-foot facility in San Francisco’s Pacific Heights neighborhood that brings science and athletics into one building. H2I Group’s scope covered both programs. The all-electric building is targeting Net Zero Energy and LEED Platinum certification.
Awards: 2026 AIA California Design Award (Merit); 2026 ENR California Best Projects, Award of Merit – K-12 Education
Science labs: In the STEM classrooms and U-Labs, H2I Group provided and installed custom wood laboratory casework with epoxy and butcher block tops, fume hoods, snorkels, flammable and corrosive safety cabinets, metal lab tables, and overhead ceiling grid systems with custom mesh panels, along with additional equipment and accessories listed below. The ceiling grid systems had to fit within a tight space between the ceiling and metal deck, so our team coordinated closely with electrical and plumbing rough-in. Our casework partner’s chain-of-custody certification and EPA TSCA Title VI and CARB compliance also supported the building’s LEED Platinum goal.
Gymnasium: In the gym, we provided six ceiling-suspended basketball goals, a mid roll divider curtain, and Draper’s EZ Pad 3.0 gym operating system, along with volleyball and badminton equipment, Daktronics scoreboards, shot clocks, and a video board, custom wall padding, and custom-graphic bleacher end curtains.
The gym sits below street level, directly above a basement, so every volleyball and badminton floor sleeve was laid out precisely to avoid penetrating the structure below. We worked with the MEP trades to keep equipment attachment points and swing zones clear, meeting clearances the architect verified by laser at closeout. Wall pad joints were aligned with the acoustical panel joints above.
Built on a tight urban site: Located in a dense residential neighborhood, the project required detailed planning for every delivery. Lab casework was palletized at the factory for hoisting to the upper floors, gym equipment was hoisted down from street level, and unloads were coordinated with the GC around partial street closures.
PRODUCTS & SERVICES
- Laboratory Equipment
- Laboratory Fume Hoods
- Laboratory Wood Casework
- Flammable and Corrosive Safety Cabinets
- Overhead Ceiling Grid Systems with Custom Mesh Panels
- Metal Lab Tables
- Epoxy & Butcher Block Work Surfaces
- Laboratory Snorkels
- Ice Machine
- Glassware Washer
- Scullery Sink
- Additional Laboratory Accessories
- Basketball Equipment
- Mid Roll Divider Curtain
- Gym Operating System
- Scoreboards & Video Board
- Shot Clocks
- Volleyball Equipment
- Badminton Equipment
- Custom Wall Pads
- Custom Bleacher End Curtains
RELATED PROJECTS
GET STARTED
LET’S TALK ABOUT YOUR
NEXT PROJECT
CONTACT US
FIND MORE ON THE BLOG
October 23, 2026
ESOPs Explained: Understanding Employee Stock Ownership Plans and Their Benefits
Learn about the benefits of Employee Stock Ownership Plans (ESOPs) and how they drive success, innovation, and thriving company cultures.
Read MoreOctober 14, 2026
What ASTM F3783-26 Means for K-12 and Higher Education Athletic Facility Managers
ASTM's Standard Guide for Inspections and Maintenance of Permanently Installed Indoor Gym Equipment, reflects an industry trend toward proactive facility management.
Read More


