Emory University
hsrb II
solution
Laboratory
Market
Science & Technology, Healthcare
location
Atlanta, Georgia
PARTNERS
JE Dunn CONSTRUCTION, HOK
ABOUT THE PROJECT
H2I Group provided laboratory and specialty equipment for Emory University’s new Health Sciences Research Building II (HSRB II) in Atlanta, Georgia. In collaboration with HOK and JE Dunn Construction, H2I Group provided this 350,000-square-foot facility, now the largest biomedical research building on Emory’s campus, with flexible, high-performance lab solutions built to support decades of evolving research.
Our scope included a wide range of lab furnishings and equipment: casework, fume hoods, biosafety cabinets, environmental rooms, and more. Designed to foster collaboration across disciplines like cancer research, cardiovascular medicine, and immunology, HSRB II is a LEED Gold-certified facility that combines sustainability, innovation, and adaptability. H2I Group’s contributions helped ensure the building meets the complex demands of modern laboratories, both now and into the future.
PRODUCTS & SERVICES
- Bedco Lab Casework
- Bedco Fume Hoods
- Labconco Dishwashers
- Labconco Bio Safety Cabinets
- Labworks Controlled Environmental Rooms
- American Epoxy Epoxy Tops
- Brandon Medical Exam Lights
- Concoa Gas Cabinets
- G2 Automated Technologies Stainless Steel Pass-Throughs
- Hoshizaki Ice Flakers
- Movex Snorkels
- Watersaver Laboratory Service Fixtures and Fittings
- Interdyne Stainless Steel Peg Boards
- Intermetro Stainless Steel Shelving
- TBJ Downdraft Workstations
- TBJ Fold-Down Exam Tables
- Carr Corporation Narcotics Lockers
- CSP Stainless Steel Casework & Tops
- LM Air Technologies Polypropylene Casework & Tops
- Tecniplast Aquatics Washer
AWARD WINNING DESIGN
The Emory University Health Sciences Reseach Building II has been recognized with multiple awards for its exceptional laboratory space. The awards below represent H2I Group and its partners commitment to excellence in scientific research and innovation.


RELATED PROJECTS
GET STARTED
LET’S TALK ABOUT YOUR
NEXT PROJECT
CONTACT US
FIND MORE ON THE BLOG
May 19, 2026
How to Lay Out & Plan a Baseball Field
When designing a gym, flooring is one of the most critical components that can make a big difference in the finished project. A well-installed gym floor not only enhances the aesthetics of the space but also ensures safety, durability, and optimal performance.
Read MoreMay 7, 2026
Understanding the Different Types of Track Surfaces
Running tracks have to provide the proper levels of traction, shock absorption, and comfort. That’s to say nothing of other considerations, such as the materials’ resistance to excessive wear and exposure to the elements, sustainability, and aesthetics. In short, athletic facilities have a lot on their minds as they prepare to build or upgrade a track.
Read More


