Tulane University
School of Medicine
solution
Laboratory
Market
Higher Education, Science & Technology, Health care
location
New ORLEANs, LA
PARTNERS
Payette, DonahueFavret
ABOUT THE PROJECT
This project was part of a multi-phase renovation of the historic Hutchinson Building in downtown New Orleans and was delivered through a strong collaboration between Tulane University, H2I Group, DonahueFavret (Construction Manager), and Payette (Architect and Lab Consultant).
H2I Group participated in BIM coordination throughout the project, working closely with the design and construction teams to model and integrate the full scope of laboratory infrastructure. Detailed 3D coordination across all specialty systems ensured precise fit and seamless installation within the historic structure. This extensive BIM effort was instrumental in aligning the work of multiple trades and maintaining the project’s schedule and quality standards.
The laboratory bench systems, wood casework, and fume hoods featured high-end finishes and custom options, demanding close collaboration among all project partners. Through detailed planning, proactive communication, and a shared commitment to quality, H2I Group successfully delivered a solution that met both functional requirements and design expectations.
PRODUCTS & SERVICES
- Laboratory Benches (Bedcolab)
- Fume Hoods (Bedcolab)
- Wood casework (CiF)
- Countertops & Worksurfaces (Durcon)
- Snorkels (Movex)
- Fixtures (WaterSaver)
- Sterilizers (Getinge)
- Canopies (Interdyne)
- Stainless Casework (Interdyne)
- Blackout Curtains (Kentek)
- Surgical lights (Cross Medical/ Burton Lights)
RELATED PROJECTS
GET STARTED
LET’S TALK ABOUT YOUR
NEXT PROJECT
CONTACT US
FIND MORE ON THE BLOG
September 30, 2026
How Much Is a Turf Field? Cost Guide
If you are planning a new athletic facility or replacing an aging field, one of your first questions may be, “How much is a turf field?” A full-sized synthetic sports field can cost about $700,000 to $2.5 million, but that broad range is only a starting point. Field size, site conditions, drainage, turf quality, labor, and added equipment all shape the final price.
Read MoreSeptember 16, 2026
8 K-12 and Campus Projects for Back-to-School Season
From K-12 gyms to collegiate research and tech-ed labs, see eight H2I Group education projects across the country. Explore our laboratory, athletic, and STEM work for schools and universities.
Read More


