UC Davis
Aggie Square
solution
Laboratory
Market
Science & Technology, Higher Education, Healthcare
location
Sacramento, California
PARTNERS
ZGF, Whiting-Turner
ABOUT THE PROJECT
Aggie Square at the University of California, Davis is designed to support a broad spectrum of life sciences and technology disciplines. This 587,000-square-foot building will host inclusive education and workforce development programs, ranging from entry-level training to advanced research and doctoral studies. With 170 shared table systems throughout the facility, Aggie Square is built to encourage collaboration, discovery, and community engagement.
H2I Group provided comprehensive laboratory solutions to meet the diverse and highly specialized needs of this forward-thinking space. From layout planning to equipment delivery, our team supported every phase to ensure Aggie Square is equipped to handle cutting-edge research and multi-disciplinary lab activities. The result is a future-ready environment that reflects the University’s commitment to innovation and inclusivity.
PRODUCTS & SERVICES
- Bedco Table Systems
- Bedco High-Performance Fume Hoods
- Bedco Casework
- Custom End Panels
- Epoxy Countertops and Sinks
- Engineering Support
- Bedding Supply System
- Bedding Removal System
- Bedding Dump System
- Bedding Dispensing System
- Tunnel Washer
- Cage/Rack Washer
- Hydrolysis Unit
- Glassware Washer/Dryer
- Bottle Filler
- Narcotics Cabinet
- Tank Washers
- Medium and Small Autoclaves
- Other Laboratory Equipement
RELATED PROJECTS
GET STARTED
LET’S TALK ABOUT YOUR
NEXT PROJECT
CONTACT US
FIND MORE ON THE BLOG
April 16, 2025
The Importance of the Right Benchtop Fume Hood
Learn how to choose the right benchtop fume hood for your lab. Discover key factors—like chemical types, ventilation systems, and space requirements—that impact safety, efficiency, and compliance.
Read MoreMarch 31, 2025
Keep Your Gym Floor Looking and Performing Its Best: Schedule a Summer Screen and Recoat
Keep your gym floor in top condition with a summer screen and recoat! This essential maintenance extends the life of your hardwood sports flooring, enhances safety, and prevents costly repairs. Schedule your recoat during summer break for minimal disruption and optimal results. Contact H2I Group today to ensure your gym floor is game-ready for the school year!
Read More