UNIVERSITY OF MINNESOTA
TED MANN STAGE
solution
FLOORING
Market
HIGHER EDUCATION, SPORTS & ENTERTAINMENT
location
MINNEAPOLIS, Minnesota
PARTNERS
SUMMIT HARDWOOD
ABOUT THE PROJECT
The University of Minnesota’s Ted Mann Concert Hall hosts many performances, concerts, as well as lectures. It was designed with acoustics as the highest priority. The auditorium is a traditional shoebox design with two tiers and raised mezzanine. H2I Group was asked to remodel and refinish the beautiful wood stage. We used custom one-inch red oak (5/4) lumber from Summit Hardwood. The expectations of the client were met and they were impressed with the end result.
PRODUCTS & SERVICES
- Custom 1" Thick (5/4 Red Oak) Flooring
RELATED PROJECTS
GET STARTED
LET’S TALK ABOUT YOUR
NEXT PROJECT
CONTACT US
FIND MORE ON THE BLOG
October 14, 2026
What ASTM F3783-26 Means for K-12 and Higher Education Athletic Facility Managers
ASTM's Standard Guide for Inspections and Maintenance of Permanently Installed Indoor Gym Equipment, reflects an industry trend toward proactive facility management.
Read MoreSeptember 30, 2026
How Much Is a Turf Field? Cost Guide
If you are planning a new athletic facility or replacing an aging field, one of your first questions may be, “How much is a turf field?” A full-sized synthetic sports field can cost about $700,000 to $2.5 million, but that broad range is only a starting point. Field size, site conditions, drainage, turf quality, labor, and added equipment all shape the final price.
Read More


