University of st. thomas
Lee & Penny Anderson Arena
solution
Athletic, Flooring
Market
Higher Education
location
Saint Paul, Minnesota
VENDOR PARTNER
Robbins Sports Surfaces
ABOUT THE PROJECT
H2I Group designed and installed two dedicated basketball practice gymnasiums for the University of St. Thomas athletic program at the newly developed Lee & Penny Anderson Arena. The project encompassed a combined 16,380 square feet of premium hardwood athletic flooring across one men’s and one women’s practice facility.
H2I Group provided the Robbins Sports Surfaces UniMax 100 maple hardwood floor system, a high-performance, engineered sports floor designed to meet the rigorous demands of collegiate athletics training. The UniMax 100 system delivers optimal ball response, shock absorption, and surface consistency required for elite practice environments.
PRODUCTS & SERVICES
- Maple Wood Gym Flooring
RELATED PROJECTS
GET STARTED
LET’S TALK ABOUT YOUR
NEXT PROJECT
CONTACT US
FIND MORE ON THE BLOG
October 14, 2026
What ASTM F3783-26 Means for K-12 and Higher Education Athletic Facility Managers
ASTM's Standard Guide for Inspections and Maintenance of Permanently Installed Indoor Gym Equipment, reflects an industry trend toward proactive facility management.
Read MoreSeptember 30, 2026
How Much Is a Turf Field? Cost Guide
If you are planning a new athletic facility or replacing an aging field, one of your first questions may be, “How much is a turf field?” A full-sized synthetic sports field can cost about $700,000 to $2.5 million, but that broad range is only a starting point. Field size, site conditions, drainage, turf quality, labor, and added equipment all shape the final price.
Read More


