FOREST LAKE HIGH SCHOOL RENOVATIONs
solution
ARCHITECTURAL WOODWORK, Athletic, FLOORING, LABORATORY, LOCKERS & STORAGE, SEATING & fURNITURE
Market
K-12 Education
location
fOREST lAKE, Minnesota
PARTNERS
dlr gROUP, ics cONSULTING
ABOUT THE PROJECT
H2I Group partnered with Forest Lake School District to implement various education solutions into their space. With several projects throughout the school, H2I Group’s solution experts met with many members of the district to create a plan for the project. This group, which included the Superintendent, coaches, and teachers, was able to tour past projects of ours to understand our full capabilities.
Forest Lake was interested in the best quality product lines and designs. H2I Group then provided options that led to the final decisions of what we would implement. Our solutions used included athletic flooring, athletic equipment, learning stairs, corridor lockers, athletic lockers, casework, auditorium seating, lab casework, fume hoods, combi system pulastic flooring, bio-mechanical subflooring, and design assist.
PRODUCTS & SERVICES
- Athletic Flooring
- Athletic Equipment
- Learning Stairs
- Corridor Lockers
- Auditorium Seating
- Lab Casework
- Fume Hoods
- Combi System Pulastic Flooring
- Bio-mechanical Subflooring
- Design Assist
RELATED PROJECTS
GET STARTED
LET’S TALK ABOUT YOUR
NEXT PROJECT
CONTACT US
FIND MORE ON THE BLOG
October 14, 2026
What ASTM F3783-26 Means for K-12 and Higher Education Athletic Facility Managers
ASTM's Standard Guide for Inspections and Maintenance of Permanently Installed Indoor Gym Equipment, reflects an industry trend toward proactive facility management.
Read MoreSeptember 30, 2026
How Much Is a Turf Field? Cost Guide
If you are planning a new athletic facility or replacing an aging field, one of your first questions may be, “How much is a turf field?” A full-sized synthetic sports field can cost about $700,000 to $2.5 million, but that broad range is only a starting point. Field size, site conditions, drainage, turf quality, labor, and added equipment all shape the final price.
Read More


