KANEKA
TECH BUILDING
solution
Laboratory
Market
Science & Technology, Health care
location
PASADENA, TX
ABOUT THE PROJECT
H2I Group was selected by Kaneka for the comprehensive renovation of their Technical Laboratory building located in Pasadena, Texas, marking a significant step in enhancing their North American R&D and QC production facilities. Kaneka, a leader in chemical, polymer, and pharmaceutical products, required a turnkey contractor with a robust portfolio in laboratory construction, prioritizing safety, experience, and innovative solutions. H2I Group met these needs by offering a full spectrum of services, including design assistance, furnishing, and installation of laboratory furniture, fume hoods, and a comprehensive mechanical and controls package for the laboratory wing. Initially engaged for an HVAC study, the project evolved into a total redesign and outfitting of six specialized laboratory spaces—Analytical, Polymerization, Production, After Treatment, Mixing, and Raw Materials Physical Testing Laboratories.
This extensive renovation not only positions the Kaneka Tech Building as a cutting-edge center for research and development but also serves as a key asset in employee retention and a showcase facility for client walkthroughs, reflecting Kaneka’s commitment to innovation and quality.
PRODUCTS & SERVICES
- Engineering Design Assist
- Mechanical Design Assist
- Custom AMS Fume Hoods
- AMS Fume Hoods
- Erlab Filtered Fume Hoods
- Fume Hood Valves & Controls
- Exhaust Fans
- Durcon Epoxy Resin Countertops
- Room Controls
- Supply and Exhaust Controls
- Trane 180 Ton Chiller
- Custom Duct Work
RELATED PROJECTS
GET STARTED
LET’S TALK ABOUT YOUR
NEXT PROJECT
CONTACT US
FIND MORE ON THE BLOG
April 16, 2025
The Importance of the Right Benchtop Fume Hood
Learn how to choose the right benchtop fume hood for your lab. Discover key factors—like chemical types, ventilation systems, and space requirements—that impact safety, efficiency, and compliance.
Read MoreMarch 31, 2025
Keep Your Gym Floor Looking and Performing Its Best: Schedule a Summer Screen and Recoat
Keep your gym floor in top condition with a summer screen and recoat! This essential maintenance extends the life of your hardwood sports flooring, enhances safety, and prevents costly repairs. Schedule your recoat during summer break for minimal disruption and optimal results. Contact H2I Group today to ensure your gym floor is game-ready for the school year!
Read More