KECK CENTER FOR SCIENCE AND ENGINEERING CHAPMAN UNIVERSITY
solution
Laboratory
Market
Science & Technology, Higher education
location
orange, California
PARTNERS
AC Martin, Jacobs, CW Driver
ABOUT THE PROJECT
The Keck Center for Science & Engineering at Chapman University spans 150,000 sq ft, holding 18 teaching labs and 22 research labs within. Designed and built by Jacobs, AC Martin and CW Driver, the facility is home to Schmid College of Science and Technology and Fowler School of Engineering. H2I Group provided modern solutions like flexible lab benches, advanced fume hoods, ceiling service panels, state-of-the-art equipment, and wood casework. The center combines cutting-edge design and functional excellence, positioning itself as a leading hub for scientific research and education.
PRODUCTS & SERVICES
- Flexible Lab Benches
- Fume Hoods
- Ceiling Service Panels
- Lab Equipment
- Wood Casework
RELATED PROJECTS
GET STARTED
LET’S TALK ABOUT YOUR
NEXT PROJECT
CONTACT US
FIND MORE ON THE BLOG
September 30, 2026
How Much Is a Turf Field? Cost Guide
If you are planning a new athletic facility or replacing an aging field, one of your first questions may be, “How much is a turf field?” A full-sized synthetic sports field can cost about $700,000 to $2.5 million, but that broad range is only a starting point. Field size, site conditions, drainage, turf quality, labor, and added equipment all shape the final price.
Read MoreSeptember 16, 2026
8 K-12 and Campus Projects for Back-to-School Season
From K-12 gyms to collegiate research and tech-ed labs, see eight H2I Group education projects across the country. Explore our laboratory, athletic, and STEM work for schools and universities.
Read More


