GLT Energy Building University of Texas
solution
Laboratory
Market
Science & Technology, Higher Education
location
AUSTIN, TEXAS
PARTNERS
Jacobs, Beck Construction
ABOUT THE PROJECT
H2I Group completed a large multi-million dollar ground-up laboratory project for the Cockrell School of Engineering, University of Texas. H2I Group’s engagement with the project began at UT System’s Capital Planning Office months before even the A/E was chosen. The H2I Group team provided full-service project support – from pre-construction to installation – of lab casework and equipment for the building’s teaching and research labs for the school’s petroleum and chemical disciplines.
H2I Group overcame some unique challenges during this project including freight elevator and supply chain issues. We coordinated moving materials into the building with aerial assistance and our special projects team showed the University why we are a Tier 1 lab supplier.
With the future of energy continuing to be shaped in Texas, we were proud to be a part of this project and this step forward for the school of engineering at the UT Austin campus.
PRODUCTS & SERVICES
- Metal Casework
- Labconco Fume Hoods
- Lab Equipment
RELATED PROJECTS
GET STARTED
LET’S TALK ABOUT YOUR
NEXT PROJECT
CONTACT US
FIND MORE ON THE BLOG
October 14, 2026
What ASTM F3783-26 Means for K-12 and Higher Education Athletic Facility Managers
ASTM's Standard Guide for Inspections and Maintenance of Permanently Installed Indoor Gym Equipment, reflects an industry trend toward proactive facility management.
Read MoreSeptember 30, 2026
How Much Is a Turf Field? Cost Guide
If you are planning a new athletic facility or replacing an aging field, one of your first questions may be, “How much is a turf field?” A full-sized synthetic sports field can cost about $700,000 to $2.5 million, but that broad range is only a starting point. Field size, site conditions, drainage, turf quality, labor, and added equipment all shape the final price.
Read More


