ENVEDA BIOSCIENCES
Laboratory
solution
Laboratory
Market
Science & Technology, Health care
location
BOULDER, COLORADO
PARTNERS
HOWELL CONSTRUCTION, DLR GROUP, LABCONCO, BEDCO, MKM Build photography
ABOUT THE PROJECT
Enveda Bioscience’s new 49,000-square-foot laboratory and office building is focused on pharmaceutical research. Their breakthroughs and experiments are helping create a search engine for new drugs.
The two-story facility primarily features laboratory space on the second floor, with smaller labs and offices located on the first floor. H2I Group equipped the first floor with movable benches to provide flexible workspace configurations, as well as the second floor, for which we provided fixed casework, including Labconco fume hoods, and Symphony Benches.
Due to the building’s lower ceilings, extensive technical coordination was essential to ensure all lab furniture, ductwork, and fume hood elements fit within the limited ceiling height. The outstanding coordination and installation resulted in a successful project.
PRODUCTS & SERVICES
- Movable Benches
- Fixed Casework
- Labconco Fume Hoods
- Symphony Benches
RELATED PROJECTS
GET STARTED
LET’S TALK ABOUT YOUR
NEXT PROJECT
CONTACT US
FIND MORE ON THE BLOG
April 16, 2025
The Importance of the Right Benchtop Fume Hood
Learn how to choose the right benchtop fume hood for your lab. Discover key factors—like chemical types, ventilation systems, and space requirements—that impact safety, efficiency, and compliance.
Read MoreMarch 31, 2025
Keep Your Gym Floor Looking and Performing Its Best: Schedule a Summer Screen and Recoat
Keep your gym floor in top condition with a summer screen and recoat! This essential maintenance extends the life of your hardwood sports flooring, enhances safety, and prevents costly repairs. Schedule your recoat during summer break for minimal disruption and optimal results. Contact H2I Group today to ensure your gym floor is game-ready for the school year!
Read More